|
Barn Conversions - 10 Years
Experience
LSE Preservation
have been carrying out barn conversions
using Delta Membranes
for over 10 years. The system is
successfully
used on not only brick, but stone
and chalk barns too. Fixings are
achieved by means of ‘cob fixing’
a system that was introduced to the
membrane industry by none other than LSE Preservation.
The Benefits of Delta Membrane:
• Fast-track
• Quick drying times
• Allows the building to breath
while completely dry inside
• Can be fixed to any substrate
with no preparation
• Guaranteed for a full 30
years
• Used and tested
on London Underground and other major
waterproofing projects.
In fact, we are
so proud of our barn conversions that
we chose one to house our very own
offices. The pictures below briefly
outline the work carried out and show
the fine end product. Feel free to come in and chat
to us about any plans you may have
and of course, have a look around.
Our Office Barn
Conversion
 |
 |
| 1.
Starting with an empty shell we
secure and re-lay any flooring
or internal structures |
2.
We then line the building with
a Delta Membrane and any cob fixings
are installed |
 |
 |
| 3.
The Delta Membrane nears completion |
4.
Walls are then plastered, floorboards
laid, electrics and plumbing are
completed |
 |
|
| 5
.Are you ready to move in and
make it your own home? |
|
|