Salvation Army Hall
The building was
very damp and cold and the Salvation
Army needed to refurbish the building
as a comfortable place of worship.
Maclennan-LSE proposed the Delta Membrane system
500 with thermal insulation boards
over.
Maclennan-LSE fitted the Delta Membrane system
500 from floor to ceiling to provide
a dry surface to fit the thermal insulation
boarding.
The finished building is now
warmer and dry, the Delta Membrane
is guaranteed for a period of 30 years.
![]() |
![]() |
![]() |
![]() |
MACLENNAN-LSE is the trading name for LSE
Building Preservation Ltd





