.
Maclennan-LSE Projects - Salvation Army Hall
 

Salvation Army Hall

The building was very damp and cold and the Salvation Army needed to refurbish the building as a comfortable place of worship.

Maclennan-LSE proposed the Delta Membrane system 500 with thermal insulation boards over.

Maclennan-LSE fitted the Delta Membrane system 500 from floor to ceiling to provide a dry surface to fit the thermal insulation boarding.
 
 The finished building is now warmer and dry, the Delta Membrane is guaranteed for a period of 30 years.

 

 

 


 
MACLENNAN-LSE is the trading name for LSE Building Preservation Ltd

Tel:  0845 658 7777 / Fax: 0845 658 7788 email: enquiries@maclennan-lse.co.uk