|
Ryde Pier - Epoxy
Resin
When the timber
supports under Ryde Pier became decayed
LSE were called upon to affect a repair.
The supports were
drilled and chiselled to remove all
of the decayed timber. A form work
was prepared and a timber resin repair
was affected. All of the work was
carried out in 4 hour shifts as the
work was below the high tide water
line.
<<
Back
<<
Back |