Fifield
Cottages, Wiltshire,
The gables on both
to these period cottages were leaning
towards each other and in danger of
collapse.
The timber shoring
had been in place for several years.
LSE Installed
HELIFIX
Cem Ties through the walls into the
massive solid chimney breast behind.
HELIFIX Helibeams
were installed into both walls to
further restrain them.
The shoring was
removed and HELIFIX and LSE Building
Preservation Guaranteed the gables
for a period of 10 Years.
<<
Back
<<
Back |