Cavity Membranes in Salisbury Wiltshire

Cavity Membranes - Axemans Cottage

The cellar had been constructed and waterproofed 2-3 years before LSE and Cellar-Tech were called in by the building contractor because there were problems with water ingress.

LSE Cellar-Tech specified the Delta membrane system with an upgraded sump and pump with battery back up and alarms .

Peripheral drainage was installed which drained to the new sump with double pumps.

The floor was covered with a sealed MS20 system and the bottom half of the walls were covered with a Delta PT Membrane.

The work was carried out in approximately two weeks and guaranteed for a period of ten years by LSE Building Preservation.

Services Menu

Water Proofing
Basement Conversions
New Build Waterproofing
Flood Control
Waterproofing Old Buildings
Waterproofing Floors
Damp Proofing
Damp Proofing Systems
Barn Conversions
Structural Repairs
Timber Resin Engineering
Chalk & Cob Repairs
Wall Tie Replacements
Timber Treatments
Wet Rot
Dry Rot
Wood Boring Insects
Traditional Lime Repairs

Projects
 
site map 0845 6587777