Cavity Membranes
- Axemans Cottage
The cellar had been constructed and
waterproofed 2-3 years before LSE and Cellar-Tech were called in by the
building contractor because there
were problems with water ingress.
LSE Cellar-Tech specified the Delta
membrane system with an upgraded sump
and pump with battery back up and alarms .
Peripheral drainage was installed which
drained to the new sump with double pumps.
The floor was covered with a sealed MS20
system and the bottom half of the walls were
covered with a Delta PT Membrane.
The work was carried out in approximately two weeks and guaranteed for a period of ten years by LSE Building Preservation.
<<