The Armoury
The armoury at Tidworth
for the MOD was suffering from rising
and penetrating damp in all walls.
The building also suffered from the
effects of condensation.
LSE installed Delta
cavity drain membrane to all of the
walls which completely damp-proofed
the walls ready for plastering.
The walls were very cold as a result
of the damp. LSE adhered thermal insulation
boards over the PT with adhesive.
The completed walls
were now warm and dry and air vents
were installed into the outside walls
to allow moisture evaporating from
the walls to escape.
<<